Structural engineering

Finalized engineering and design drawings.

Demolition permit paperwork

Collect and oversee paperwork required by the external permitting agency:

  • Current building and site servicing plans
  • Utility sign-off
  • Local authority sign-off
  • Methodology for demolition
  • Commitment of review
  • Notice of project
  • Designated substance survey and asbestos report
  • Demolition application permit
  • Payment of demolition fees 

Site design and permits

Coordinate with engineering firm and surveyors to prepare appropriate documentation and applications needed to receive necessary permits to start construction, including:

  • Site plan
  • Utility plan and design
  • Grading and erosion plan
  • Storm water pollution prevention plan
  • Traffic study
  • Landscape plan
  • Structural review of building design
  • Wetland jurisdictional determination and mitigation plan